DUNG TIEN - GIANG BIEN
-
INVESTOR
DANG KHOA GROUP JOINT STOCK COMPANY
-
LOCATION
Tien Minh Commune, Hai Phong City
-
DURATION
50 years (2025 - 2075)
-
INVESTMENT CAPITAL
790,436,430,200 VND
-
ORIENTATION
Diversified industries, prioritizing clean production and logistics.
-
SCALE
49,7 HA
LOCATION AND REGIONAL CONNECTIVITY

-
ROAD
Located near National Highway 10 and the expressways connecting Hanoi - Hai Phong - Quang Ninh..
-
RAILWAY
Located near the Hai Phong - Hanoi railway line and the Hai Phong - Hanoi - Lao Cai railway line.
-
AIR
Kết nối thuận lợi với sân bay Quốc tế phục vụ vận tải hàng hóa.
-
SHIPPING
Access to the largest seaport system in Northern Vietnam within a short radius.
- The Dung Tien - Giang Bien Industrial Cluster is planned in Vinh Thuan commune, Hai Phong city. Hai Phong possesses a particularly important economic position as it is located at the northeastern gateway of Vietnam, directly connected to the sea and international trade routes. It is the largest seaport in the North, playing a key role as a hub for import and export of goods.
- Its favorable geographical location connects directly to Hai Phong's main transportation arteries and the Northern key economic region.
- The population density is 998 people/km². This creates an abundant labor force. Furthermore, its location borders many densely populated areas, which can attract additional low-cost labor from neighboring regions.

LOCATION AND REGIONAL CONNECTIVITY
GEOGRAPHICAL ADVANTAGES OF DUNG TIEN - GIANG BIEN INDUSTRIAL PARK
- Distance from Hanoi – Hai Phong Expressway and Hai Phong – Ha Long Expressway: 7km
- Adjacent to National Highway 10
- Coastal Expressway: 7km
- Hanoi – Hai Phong Railway: 10km
- Distance from Nam Dinh Vu Port: 30km
- Distance from Nam Do Son Port: 15km
- Lach Huyen Deepwater Port: 35km
- Distance from Cat Bi International Airport: 30km
- Noi Bai Airport: 118km
- Abundant, high-quality labor force




MASTER PLAN

TECHNICAL INFRASTRUCTURE
-
WATER SUPPLY SYSTEM - Current capacity: 200 m³/day.
-
POWER SUPPLY SYSTEM - Transformer substation: 15MVA.
- Modern underground electrical system.
-
SOLID WASTE AND WASTEWATER MANAGEMENT - Planning for concentrated solid waste disposal sites.
- Planning for wastewater collection pipelines using HDPE-D300 and HDPE-D400 pipes.
- Wastewater treatment capacity of 2,000 m3/day.
- Wastewater must be treated to meet column B and value C of QCVN40;2011/BTNMT before discharge.

INFRASTRUCTURE INVESTMENT PLAN
INTEGRATED INFRASTRUCTURE - THE FOUNDATION FOR GROWTH

GPMB and leveling

Traffic, drainage

Electricity, water, and telecommunications

Landscape & Handover
The infrastructure investment plan is implemented in stages, ensuring quality and timely handover to businesses leasing land.
INVESTMENT AND CONSTRUCTION PROGRESS
END OF 2025
CONSTRUCTION BEGINS
COMPLETE
LEGAL PROCEDURES
END OF Q1/2027
INFRASTRUCTURE CONSTRUCTION AND OPERATION

CRITERIA FOR ATTRACTING INVESTMENT
A CLEAN INDUSTRIAL CLUSTER ATTRACTING PRODUCTION PROJECTS WITH MODERN, ENVIRONMENTALLY FRIENDLY TECHNOLOGY:
Electronics and Information Technology Industry
Electronics, refrigeration, telecommunications, information technology, and high-tech industries (manufacturing of micro-electromechanical systems, nano-electromechanical systems and related devices, production of integrated network equipment, high-capacity memory, software production, etc.)
High-Tech Supporting Products Manufacturing Industry
The high-tech supporting products manufacturing industry (high-precision molds, high-quality standard mechanical parts, electronic components, microelectronic circuits, component assemblies, spare parts for power generation systems from new and renewable energy sources, etc.)
Electrical Equipment Manufacturing Industry
The electrical equipment manufacturing industry (electric fans, plugs, sockets, switches, circuit breakers, high-pressure lamps, transmission transformers, etc.)
Clean Industry
Clean industry (clothing, footwear, stationery, medical supplies, etc.)